Update: my 8x10 shed pad needed 32 bags of concrete and I was off by 9
Found a quikrete calculator online that said 23 bags for a 4 inch slab, but the lumber yard guy in Waco laughed and told me nobody pours 4 inches anymore. What depth are you all actually pouring for a shed floor, because I'm not hauling another pallet.