That $20 chalk line reel kept jamming, so I switched to the string method

For boiler tube layouts the chalk line was always snagging on the header edges, drove me nuts for months. I started pulling a tight nylon string between two studs and snapping it, way smoother and no chalk dust all over the place. Anyone else ditch the reel for something simpler on big layouts?
1 comments

Log in to join the discussion

Log In
1 Comment
terrymitchell
So you're saying the string never stretches or sags on those long boiler runs, or do you just retighten it every few feet?