DAE almost lose a whole day to bad mortar on a Tuesday pour at the Ridgeview job
Was setting a 12 foot wall run at the Ridgeview site last Tuesday when the second batch of mortar started setting up way too fast in the board. Turned out the sand pile had gotten rained on over the weekend and nobody covered it, so I dumped both batches and mixed fresh with bagged sand from the supply yard on Halsted. Cost me about 3 hours and one pissed off foreman, but the wall went up clean and passed inspection Friday. How do you all handle wet sand piles on site when the weather flips on you?