Nearly cost me a course: the mortar mix that looked fine until I tapped it
Was laying a garden wall out in Fresno last week and the mud felt a little stiff going on the board, but it spread okay so I kept going. About twenty blocks in I tapped one with the trowel handle to check the joint and the whole thing shifted, turned out the sand was too wet and the mix was basically dead. I pulled the last hour of work down, remixed from scratch, and re-laid it, which cost me a whole afternoon. Now I do a quick tap test on the first block of every batch before I commit. Any of you got a fast way to check a mix before it's on the wall?