Update: the 6 foot scaffold frame I set up Tuesday gave out halfway through the chimney chase and I'm still sore
So this went sideways on me Tuesday morning on a chimney rebuild out in Beaverton, and I'm still feeling it in my shoulder. I had my 6 foot frame set on what I thought was solid ground next to the house, got maybe 4 courses up the chase, and the whole right leg sank about 8 inches into soft dirt I never noticed under the grass. The frame tipped and dumped the boards and my tote of tools, and I caught myself on the wall so I didn't go down with it. Lucky nobody else was on it, but I cracked a level and bent a corner of the frame that I had to hammer back at the end of the day. Now I'm out there probing the ground with a rebar before I set anything, which I should've been doing the whole time. My question is how do you folks handle setup on soft or backfilled dirt next to a house? Do you always throw down pads or is there a smarter way to check before you trust a frame?