Guy in Phoenix taught me to leave a service loop behind the wall plate and it bailed me out twice now
I was doing a 6 outlet job in a Phoenix apartment complex last year and an old installer named Ray was paired with me for the day. He saw me screw a plate on with barely any slack and said, "You leave at least a foot coiled in there, kid, you'll thank me later." Sure enough, two months later a tenant yanked their TV off the mount and snapped the fitting right off the wall. I popped the plate, cut back the bad end, and re-terminated in about 4 minutes instead of running a whole new drop. Do you all leave a loop, or is that just asking for a pinched cable on tight boxes?
How tight are these boxes you're dealing with, though? A foot of slack in a plastic single gang is one thing, but in a metal box with a plaster ring there's barely room for the device let alone a coil. I'm with you on leaving some slack for service, but the trick is coiling it flat against the side and taping it so it doesn't sit right behind the screws. Ray's advice is solid, I just wonder if a full foot is right for every box or if it's more about knowing where the pinch points are. What kind of boxes was he running in those Phoenix units?