PSA: A lead installer told me my seams were garbage because of one dumb habit, and he was right
Two years back a lead guy walked my job in Bakersfield and ran his hand along a seam I'd just finished, then said flat out that I was starving the seam and it would fray inside a year. He said I was cutting the seam tape at 4 inches instead of letting it run past the edge, and that I was rushing the iron at too low a heat. I swallowed my pride, switched to a full 6 inch overlap and bumped my iron settings up, and I have not had a callback on a seam since. Cost me about 20 extra minutes per room at first but it saved me way more than that in redo work. Anyone else get called out on something small like that and have it stick with you?