Picked the cheap insert over the fancy one for a 300 piece run, and now I'm wondering
Had a job for a local shop here in Wichita doing 300 aluminum brackets, and the boss left it up to me which insert to run. I could grab the coated carbide we keep in the drawer or order the fancy PVD ones that cost about $18 a pop. I went cheap since the run was aluminum and I figured why burn money. It cut fine for the first 180 parts and then the edge started going away, so I was swapping inserts every 40 pieces by the end. Did the math and it came out close to the same money as the nicer ones would've been, just with more time lost. Now I can't tell if I saved anything or just traded dollars for standing at the machine. Anyone got a feel for when the cheap insert is actually the smart call on longer runs?