TIL my 4 inch slump mix ate a whole extra yard on a 22 by 30 slab in Fresno
I poured the back patio last Thursday and my order came up a full yard short, which had never happened to me on a slab that size. Turns out I was adding water at the chute instead of calling for a plasticizer, and that wet mix spreads thinner and burns through more concrete than my usual 5 inch slump. Has anyone else tracked how much extra yardage they lose to a wet mix before the mud even hits the forms?