Spent 3 weeks on a 12,000 sq ft slab down in Lantana, and the owner kept pushing back on my saw cut spacing. He wanted 12 foot squares, I kept saying 10 is where you need to be for this mix. Last week we got a hairline crack right along his line, not mine. He called me Friday apologizing and asked if I'd redo the control joints on the next phase. Has anyone else had a client fight you on joint spacing and then act surprised when the slab does exactly what concrete does?