Rant: The temporary crane pad at the new Riverside site looked like it was set on a sponge.

I was out there yesterday and the whole thing shifted nearly two inches under a static load, which is a problem nobody wants to find after the rig is up.
3 comments

Log in to join the discussion

Log In
3 Comments
reese_bell
reese_bell2mo ago
Yeah, but that much shift under static load means the ground prep was off... could be a real problem if the load changes or it rains.
6
wesley_grant33
Two inches on a sponge pad? That's what they're for, to spread the load on soft ground. Seen way worse settle without issue. As long as the crane level is good, it's probably fine.
4
webb.jordan
... and I get what @reese_bell is saying about the ground prep, but the real issue is what happens when you get a sudden rain event and that pad starts to hydroplane under the load. Nobody's talking about the drainage factor at that site... I've seen a good setup turn into a mess when water gets under the mat.