19
PSA: That time I got quoted $14,000 for a bathroom gut job vs doing it myself
So I went to get quotes for a small bathroom reno in the burbs outside Cleveland. First contractor came in at $14k for a full gut and tile. Second guy said $11k but wanted cash only. I ended up doing it myself with my crew on a Saturday for about $4,500 in materials. But here's the thing - it took us 3 weekends instead of the promised 5 days. Now I'm wondering if I should have just paid the pros. Has anyone else here had to choose between paying big money for a job versus rolling up your sleeves and losing your weekends?
2 comments
Log in to join the discussion
Log In2 Comments
skylerg1728d ago
First thing I'd ask is how long those three weekends actually were. I've done two bathroom gut jobs myself and both times I underestimated drywall finishing and tile work. If your crew is friends with day jobs, three full Saturdays is roughly the same labor hours as a pro's five days, just spread out. The cash-only guy at $11k would have made me nervous for warranty reasons. My rule now is simple: pay the pros for plumbing and electrical rough-in, do the demo and finish work myself. That usually lands around $6-7k total and saves me from spending every weekend grouting. Honestly, $4,500 is a steal if everything works and doesn't leak.
6
jamiesingh28d ago
$4500 is a steal but you gotta check the permit situation. In my county a full bathroom remodel requires permits if you move plumbing or electrical. Even for a gut job.
@skylerg17 your point about warranty is spot on. Cash only guys vanish when something goes wrong. Had a buddy learn that the hard way.
Drywall finishing is the real killer. Takes more time than anything else in a bathroom gut. Tiles too if you are doing something complicated.
But yeah, if the work is solid and no leaks, $4500 is basically material cost plus beer money. Just make sure you can actually find those guys again if something breaks.
6