Pro tip: shim your drawer slides AFTER the box is in, not before
Spent 4 hours last Saturday fighting a single 18 inch drawer that kept rubbing the frame on the left side. Kept pulling the slide off, shimming the back, reinstalling, still rubbed. Finally sat back and looked at the face frame and realized the cabinet side was out of square by almost 3/16 from the wall settling. Put the shim behind the slide while the drawer was sitting in the box and it slid smooth in 10 minutes. Whole thing took me from 8am to lunch when it should've been a 45 minute job. Any of you check the carcass for square first or do you just chase the rub like I did?
Reminds me of helping my buddy hang a heavy shop door in his garage. Frame was racked about a quarter inch and we fought that thing for an hour before he thought to check it with a level. Stuck a cedar shingle behind the bottom hinge and it swung perfect on the first try. Now I check every opening with a square before I even pull the tools out.