Why does nobody mention how much a good tape measure guy saves you on face frames
Honestly, I was building a set of maple face frames for a kitchen in Grand Rapids last week and my helper kept pulling the tape from the hook end instead of the blade end. An old timer named Walt who shares my building stopped by and watched him for about 30 seconds before saying "son, that hook moves a sixteenth and you just put your whole frame out of square." He showed him to burn an inch on every cut and check it against the blade mark, and we ended up scrapping two rails that day but saved the rest of the run. That one tip has cut my waste down to almost nothing on a 40 foot run of frames. Has anyone else had a guy just drop one small thing that fixed your whole workflow?